
Add to Cart
Plastic Mold (Moulds) production process | Description |
1. 3D Design/Samples for quotation | According to 3D drawing or samples for quotation. |
2. Negotiations | Including the price of molds, molds sizes, material for cores & cavities, weight of product, part cost, payment, mold lifetime, delivery, etc. |
3. Purchasing Order | After the customer confirming the mold design and quotation. |
4. Making mold(moulds) | Confirm drawing, start to do DFM, mold flows and mold detail agreed with the customer, start production. |
5. Production schedule | Every week we will feedback to the customer a mold progress(picture). |
6. sample shoot | We provide the molds test samples for confirmation (about 10-15 piece), then, get your signature sample, mass production. |
7. Package | Wooden case for moulds, cartons for parts, or as your requirement. |
8. Delivery | deliver goods by air or by sea. |
Plastic Injection Tooling |
2k Injection Molding |
Automotive Plastic Injection Molding |
Multi Cavity Injection Moulding |
Medical Plastic Injection Molding |
Die Casting parts |
Plastic Moulding Parts |
Auto Plastic Parts |
Electronic Plastic Parts |
Motorcycle Plastic Parts |
Injection Molded Plastic Boxes |
Plastic Household Products |
Plastic Light Covers |
Digital Parts |
· Electric appliance: air condition, television, DVD
· Toys: car model, motorcycle model etc.
· Hardware: faucet, head shower, bath equipment, sanitary ware
· Digital product: computer, MP4, mobile phone, digital camera
· Transportation: automobile pat, instrument board etc.
· Medical treatment devices: massager, sphygmomanometer
· Telecommunication equipment: telephone, fax machine
Our service:
After model and prototype are confirmed, it will be mold design and manufacturing, product injection and production assembly. We have strict production management and an excellent manufacturing team. Our experienced engineers and salesmen will ensure that your industrial engineering to tooling engineering, project management by experienced engineers and efficient engineering discussion is available at anytime. We have excellent mold making lead time, some molds 42 days, some molds even 21 days, up to your parts design.
1, Product Design
We Provide Product Design Service As Customer's Request.
2, Mold Design
We will communicate &exchange the opinion with customers during Mold Deisgn
3, Mold Making
Start to manufacture, we will send photos to show tooling process.
4, Provide the sample
Once the sample finish, we will send the sample to customer confirm
5, Mass Production
After customer confirmed the sample, we will start mass production plastic products.
6, Assembly
We Also Provide Assembly Service for Our Customer.
Painting & Coating
We can provide coating and rubber coating service for your customers.
7, Printing
We Also Provide Silk Screen Printing, Pad Printing, Heat Transfer Print Service.
8, Packaging Box
We also make the packaging box as customer request.
Quality Control
Packing and Shipping
FAQ
Q1: Are you a trading company or a manufacturer?
A1: We are a manufacturer as you can see our workshop as above.
Q2: what are the minimum & maximum unit weight and size your machines can produce?
A2: Our machines produce unit parts from 1 gram to 6000 grams of weight.
Our machines can produce the maximum size of unit plastic part: 1.5*1.5*1.5 meters.
Q3: Do you support OEM?
A3: Yes, we can produce by technical drawings or samples.
Q4: How do you pack the plastic molded parts?
A4: We pack the plastic molded parts by thick-wall cartons.
If the finished surface of plastic molded parts requires safe protection to avoid scratches, we will use a bubble plastic bag to pack the parts.
FAQ About Worldwide Delivery
Q5: Can you deliver the plastic moulds or plastic products to our factory?
A5: Yes, We have cooperated with many international logistics companies for years.
And we have full experience to manage the delivery directly to the client's factory or appointed warehouse.
Mould Trade Process
Quote:According to sample, drawing and specific requirement.
↓
Discussion:Mold material, cavity number, price, runner, payment, etc.
↓
S/C Signature:Approval for all the items
↓
Advance:Pay 40% by T/T
↓
Product Design Checking:We check the product design. If some position is not perfect, or can not be done on the mould, we will send customer the report
↓
Mold Tooling:We start to make mold after mold design confirmed
↓
Mold Processing:Send report to customer once each week
↓
Mold Testing:Send trial samples and try-out report to customer for confirmation.
↓
Pay 30% by T/T on trial samples
↓
Mold Modification:According to customer's feedback
↓
Balance settlement:30% by T/T after the customer approved the trial sample and mould quality.
↓
Delivery:Delivery by sea or air. The forwarder can be designated by your side.