Dongguan Howe Precision Mold Co., Ltd.

Serve products to the world Build molds to the globe

Manufacturer from China
Verified Supplier
7 Years
Home / Products / Multi Cavity Injection Moulding /

Single / Multi Cavity Plastic Injection Molding Auto Parts PVD / CVD Coating

Contact Now
Dongguan Howe Precision Mold Co., Ltd.
Visit Website
City:dongguan
Province/State:guangdong
Country/Region:china
Contact Person:MrsBetty Lee
Contact Now

Single / Multi Cavity Plastic Injection Molding Auto Parts PVD / CVD Coating

Ask Latest Price
Video Channel
Brand Name :OEM/ODM
Model Number :HW-111
Certification :ISO9001
Place of Origin :China
MOQ :100 pieces
Price :negotiable
Payment Terms :T/T
Supply Ability :15000 pieces per month
Delivery Time :25-30days
Packaging Details :PE bag , as customer requested
Multi Cavity Injection Moulding :Single/Multi Cavity plastic injection auto parts mould and molding
Surface treatment :PVD/CVD coating
Longevity :0.5-1 million shots
Tool Material :718H, P20,NAK80,2316, 2738
Runner :Cold Runner
Tolerance :± 0.02mm~± 0.05mm
Gate Type :Pin Point Gate
Ejection system :Stripper plate,Lifter,Push Bar,Ejection Pin etc
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Single/Multi Cavity plastic injection auto parts mould and molding

Mould Information:

Mold information Content
Product Material ABS,PP,PC,PA,PMMA,PS,POM and etc.
Moldbase FUTABA,LKM,HASCO,DME
Cavity material 45#,50#,P20,H13, 718 2738, NAK80, S136, SKD61 etc.
Runner Cold/Hot runner
Cavity Multi or single cavity
Standart parts Hasco
Gate type Side gate,Sub gate,Pin point gate,Edge gate etc.
Treatment Heat treatment and Nitriding,polish, etc.
HRC H45~52
Product weight 50~5000g
Machine type 160Ton,250Ton,650Ton
The standard of appearance of the products for stripe MT(Mold Tech),YS,HN series
The way of Color contrast RAL K7,PANTONE

Plastic Mold (Mould) production process:

1. 3D drawing/Samples for quotation: According to 3D drawing or samples for quotation.

2. Negotiations: Including the price of moulds, moulds sizes, material for cores & cavities, weight of product, product color, payment, moulds lifetime, delivery, etc.

3. Purchasing Order : After the customer confirming the mould design and quotation.

4. Making mold(moulds): Confirm drawing, start to do DFM, mold flows and mold detail agreed with the customer, start producion.

5. Production schedule: Every week we will feedback to the customer about the mold progress(picture).

6. Sample shoot: We provide the moulds test samples for confirmation(about 10-15 piece), we will start mass production when get your signature samples.

Single / Multi Cavity Plastic Injection Molding Auto Parts PVD / CVD CoatingSingle / Multi Cavity Plastic Injection Molding Auto Parts PVD / CVD Coating

Hot runner

Chinese or international famous brand hot runner systems.Hot runner or cold runner with good cooling system. hot runner system is designed and made by ourselves, it can achieve ideal and prompt heating effect for plastic production, cavity with lower injection pressure to reduce wear and tear of mould parts

Heating system

with double heating system, it has separate temperature control mode ,the heat bar are used to heat hot-runner manifold , small heaters supply the heating temperature for cavity nozzle continuously.

Cooling system

each parts including core ,cavity has independently cooling system.

Heating treatment
mechanical treatment cavity and core to prolong service life ,nitrogen treatment with neck screw. with fitly operation ,guarantee Long using life over 2.0 million times of injection cycle.

Advanced Testing and Processing Equipment
Many machine tools are imported from America and Japan, such as Machine center, CNC lathers, EDM and so on. All of these increases processing precision, good interchangeability

Note tips:

1. when you stop producing or remove the mould, please paint antirust paint on cavity, thread mouth, core to prevent mould sweat and corrosion.

2. If the mould is unuse,you can put it to dry place and paint anticorrosive oil on outer to Prevent moisture.for next time use.

Special satisfied service

1.we will send the weekly mould process report and tooling schedule each 5-10 work days.
2. we will send the first testing sample for buyer's inspection and work out improvement requirements.
3. we will send the mould testing video before shipment.

Single / Multi Cavity Plastic Injection Molding Auto Parts PVD / CVD Coating

Inquiry Cart 0