
Add to Cart
2k double shot injection plastic Electric drill casing molding
Mould Information:
Mould material | P20 steel, 718, 2738, H13, NAK80, 2344, 2343, S136, etc . |
Mould type | Injection plastic mould |
Product material | ABS,PA,PA66+GF,POM,PC,PP,PET,TPE,PVC,HDPE,etc |
Mould base | HASCO, DME, MISUMI, JIS, LKM, etc. |
Mould runner | Hot/Cold Runner |
Mould tooling equipment | Lathe, Milling, Grinder, Drill, CNC, EDM, Wire cut machine, Punch machine |
De-mould Type | Automatic Ejector |
Maximum mould size | 1500*1500 mm |
Gate | Side Gate, Sub Gate, Direct Gate, Hook Gate, Pin Point Gate, etc. |
Cavity | Single or Multi cavities |
Mould Life | 45#:300,000 to 500,000 shots |
P20:600,000 shots | |
718: 800,000shots | |
Lead time | About 3-4 weeks |
Package | Wooden packing box or as customer's requirements |
1. Company Information:
HOWE specializes in injection molding industries and dedicated to be the well-deserved molder providing the best service to our customers globally.
2. Our Strength and Service:
1) Quick quote response and reasonable price for different MOQ requirements. And one NDA will be followed to warrant the confidentiality of the customers' files and documents received.
2) Internal feasibility study review meeting to cover all the aspects related to the quoting projects will be conducted and one internal feasibility study report along with timing plan and capacity analysis report will be prepared accordingly.
3) The tooling and molding reports will be prepared and provided based on different customers requirements when the new projects are officially nominated and kicked off.
- DFM Study Report
- Mold Flow Analysis Report
- CAD/CAM in real 3D Environment for mold
- Complete mold manufacturing processes tracking report update
- New samples submission and tooling modification loops tracking
- Molding process DOE report and process setting sheet improvement
- FAI/ISIR Reports submission on schedule
- PPAP/Qualification reports submission to customer
4) Professional program management will ensure close communication and frequent update regarding the new projects to our customers through the whole project phases.
5) Good quality control systems and training will help us to deliver high-quality parts to our customers strictly and continuously.
6) Good consolidation for the toolmakers and secondary process suppliers around the Dongguan region will help us to be more competitive in the molding industry.